Final drive
I have found results from200000+products and100000+suppliers aboutFinal drive
Excavator Final Drive Parts Travel Motor Assy Phv-390-53b for PC40-8 Ex40 Yc35-6 Travel Motor Assembly
154-03-C1110 Shantui SD22 Final Drive Gear Made in China
NACHI Phv-1b Hydraulic Travel Motor/Final Drive for Hitachi Zx18 Excavator Kubota Ishikawa 10f2 1ton-1.8ton
Kayaba Kyb Travel Motor Original Kyb Final Drive Mag-230vp
High-Performance LG LG933L Wheel Loader Final Drive Assembly
Hydraulic Motor-Wheels with Planetary-Type Final Drives for Self-Propelled Windrowers
E320 Travel Motor Travel Assy 221-7637 507-6558 Final Drive for Excavator
Travel Motor Final Drive Mag85vp-1800 for Sh120 E311 E312 E312b E312c E312D
Sdlg Wheel Loader L978 Final Drive 29070013321 for Sale
Quality Final Drive Used for Hydraulic Crawler Excavator Komatsu PC75uu
Cat 320 Travel Final Drive 507-4561 507-4565 507-4562 for Excavator
Good Price Mantall 2 Bare Pacing China Wheel Loader Part Final Drive Self-Propelled Xe140W
452-6213 4526213 Final Drive for 305.5 305.5e Excavator
227-6188 / 2276188 Travel Motor Final Drive Assembly for C at 365c Ca T374D Excavator
Dx60 Hydraulic Travel Motor Final Drive for Excavator
Excavator Parts 9t-7099 9t-3680 8u-4629 6e-3683 4e-9197 9t-2306 9t-2507 155-9912 Final Drive
Excavator Hitachi Zx350 5g Zx350 Zx330 3 Travel Motor Travel Gearbox 9281920 Final Drive
R220LC-9s 39q7-40100 R220-9 R225-9 R215-9 R210-9 R260-9 R210LC-7 Final Drive for Hyund*Ai Excavator Parts
Original New Excavator Parts PC200-8 Final Drive 20y-27-00500 20y-27-00560
Genuine New Zx850 Zx850-3 Zx850LC-3 Travel Device Zx870 Zx870-3 Zx870LC-3 Final Drive
Brand Original 21t-27-00410 Final Drive for Komatsu PC2000-8 Excavator Heavy Equipment Parts
Hydraulic Gearbox Final Drive Assy Travel Motor Phv-4b-60b for PC55mr PC56
San'y Excavator Final Drive Unit 12940338 Travel Motor Gearbox Suitable for Sy305c
GM60va Travel Motor Final Drive for @Ko Belco Sk330-8 Sk350-8 Excavator
Sourcing guidance for Final Drive
What are the key technical specifications to evaluate when sourcing a final drive?
When selecting a final drive, you must prioritize torque density and gear reduction ratios to ensure the unit matches the machine's hydraulic output. Key specs include the displacement (cc/rev), maximum operating pressure (typically 30-35 MPa), and output torque. Ensure the mounting dimensions (flange diameter and bolt hole patterns) are 100% compatible with your specific excavator or crawler model to avoid costly installation failures.
How can I verify the quality and durability of the internal components?
The longevity of a final drive depends on the heat treatment process of the planetary gears and the quality of the floating seals. Request suppliers to provide evidence of induction hardening or carburizing for gears to ensure a surface hardness of HRC 58-62. Additionally, verify that the unit uses high-grade bearings (such as NSK or SKF) and high-pressure resistant oil seals to prevent leakage and premature wear in harsh environments.
What compliance standards and certifications should a professional supplier possess?
Reliable manufacturers should hold ISO 9001:2015 certification for quality management systems. For hydraulic components, look for compliance with CE marking (for the European market) and evidence of rigorous factory testing, including 100% hydraulic leakage tests and noise level testing (typically <80dB) before shipment. Suppliers on Made-in-China.com with 'Audited Supplier' status provide an extra layer of verification regarding their production capabilities.
What are the common usage scenarios and maintenance requirements for final drives?
Final drives are critical for tracked construction machinery like excavators, bulldozers, and drill rigs. To ensure a service life of 5,000+ hours, buyers must emphasize regular gear oil changes (every 500-1,000 hours) and the use of high-viscosity extreme pressure (EP) lubricants. Advise end-users to check for metal shavings in the magnetic plug, which serves as an early warning sign of internal gear fatigue.
Cross-Border Procurement Risks and Strategic Advice
How can I mitigate the risk of receiving a final drive that doesn't fit my machine?
The most common risk is dimensional mismatch. Always provide the supplier with the machine model, part number, and the number of frame/sprocket bolt holes. Request a technical drawing (PDF or CAD) for approval before production. For customized OEM orders, a sample trial is highly recommended to verify hydraulic port alignment and travel speed synchronization.
What are the best practices for negotiating price and lead times with Chinese suppliers?
Focus on Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for extended warranties (12-24 months) instead of small price cuts, as this proves the supplier's confidence in their product. For bulk orders, aim for a 10-15% discount at the 10-unit tier. Ensure the contract specifies a lead time (usually 7-15 days for stock items) with clear penalties for delays to protect your supply chain.
How should final drives be packaged and shipped to ensure safe arrival?
Final drives are heavy, high-precision hydraulic components. They must be shipped in fumigated wooden crates with internal shock-absorbing foam and anti-rust VCI bags. Since these units contain residual oil, ensure the supplier provides a Non-Hazardous Chemical Declaration to avoid customs delays. For international shipping, FOB or CIF terms are standard; however, ensure the cargo is insured for its full replacement value.
How can I ensure transaction security when dealing with overseas suppliers?
Utilize secure payment methods and prioritize suppliers on Made-in-China.com who offer Star Ratings and comprehensive audit reports. Always conduct a pre-shipment inspection (PSI)—either via a third-party agency or by requesting a video of the unit undergoing a pressure test with your specific serial number visible—to ensure the product meets the agreed-upon performance benchmarks before final payment.





























