Nanjing turbine
I have found results from8000+products and3000+suppliers aboutNanjing turbine
500kw Back Pressure Steam Turbine (Single-Stage)
2000 - 4000 Kw Back Pressure Steam Turbine (Two-Stage)
70MW Extraction Back-Pressure Steam Turbine
SA-1.5 Medium Supplementary Admission Steam Turbine (1.5MW Class)
SA-6 Large Supplementary Admission Steam Turbine (6MW Class)
100MW Condensing Steam Turbine - Double Cylinder Double Flow (Model N100-8.83/535)
C30-6.1/0.81 Extraction Condensing Steam Turbine (30MW)
Cc60-8.83/1.27/0.49 Double Extraction Condensing Steam Turbine (60MW)
Horbon Hb600 Distributed Control System Steam Turbine/Gas Turbine/Power Plant
Horbon Hb600 Distributed Control System for Turbine Generator/Gas Turbine Power Generator
New Siemens Sst400 Steam Turbine Generator Set 30MW Power Plant
200hw Center Admission Single Casing Back-Pressure Steam Turbine
1000 - 2000 Kw Single-Stage Back Pressure Steam Turbine
25-40MW Back Pressure Steam Turbine (High-Pressure with Reheat Option)
15-20MW Back Pressure Steam Turbine Combined Cycle Turbine (High-Pressure Multi-Stage)
6000 - 10000 Kw Back Pressure Steam Turbine (with Controlled Extraction)
6MW Extraction Back-Pressure Steam Turbine
300MW Extraction Back-Pressure Steam Turbine
SA-100 Ultra-Large Dual-Casing Reheat Supplementary Steam Turbine (100MW Class)
SA-15 CHP Supplementary Admission Extraction Steam Turbine (15MW Class)
C1.5-2.35/0.98 Extraction Condensing Steam Turbine (1.5MW)
Cheap 1kw 2kw 3kw 5kw 10kw Wind Turbine Windmill Wind Fan Supplier
300W Portable Wind Turbine 12V 24V for Wind Solar Complementary Road Light
Wind Turbine 300W 12V 24V Working with Solar Panel Complementary Power for Street Light
Common Industrial Steam Turbine and Turbine Generator for Industry Driving
Power Plant Steam Turbine Generator Repair Maintenance Improve Project
1-80MW Power Plant Steam Turbine Generator Repair Maintenance Improve
Sourcing guidance for Nanjing Turbine
What are the key technical specifications to evaluate when sourcing Nanjing-style turbines?
Buyers must prioritize rated power output (MW), inlet steam pressure/temperature, and heat rate efficiency. For industrial applications, ensure the turbine supports combined heat and power (CHP) configurations. It is critical to verify the rotor material grade (e.g., high-temperature alloy steels) and the blade manufacturing process, as these directly impact the unit's operational lifespan and thermal fatigue resistance.
Which international compliance standards are mandatory for heavy power equipment?
The equipment must adhere to ISO 9001 for quality management and ISO 14001 for environmental standards. Depending on the destination market, ensure compliance with ASME (American Society of Mechanical Engineers) for pressure vessels, CE marking for the European Economic Area, or IEC (International Electrotechnical Commission) standards for the integrated generators and electrical control systems.
How can a buyer verify the performance and reliability of a turbine before shipment?
Request a Factory Acceptance Test (FAT) report. This should include overspeed testing, vibration analysis, and dynamic balancing of the rotor. For large-scale B2B procurement, it is highly recommended to hire a third-party inspection agency (such as SGS or Intertek) to witness the load testing and verify that the heat rate and steam consumption meet the guaranteed values specified in the contract.
What are the requirements for the control and automation systems of these turbines?
Modern turbines should be equipped with a Digital Electro-Hydraulic (DEH) control system and a Turbine Supervisory Instrument (TSI). Ensure the system is compatible with mainstream Distributed Control Systems (DCS) like Siemens or ABB via Modbus or Profibus protocols to allow for seamless integration into the power plant's central monitoring station.
Cross-Border Procurement Strategy & Risk Management for Heavy Machinery
What are the primary risks in cross-border turbine procurement and how to mitigate them?
The main risks include technical mismatch and logistical damage. Mitigate these by using detailed technical protocols as contract appendices. For transaction security, utilize Letters of Credit (L/C) or secure payment terms on Made-in-China.com to ensure funds are only released upon verification of shipping documents and inspection certificates.
What shipping and logistics precautions are necessary for oversized turbine components?
Turbines are heavy-lift and oversized cargo, requiring Breakbulk shipping or Flat Rack containers. Ensure the supplier uses seaworthy packaging with VCI (Volatile Corrosion Inhibitor) film and vacuum sealing to prevent salt-air corrosion. The contract should clearly define Incoterms (e.g., CIF or DAP) and include comprehensive marine insurance covering 110% of the cargo value.
How should buyers negotiate after-sales support and spare parts availability?
Negotiate a guaranteed response time (typically 24-48 hours) for technical consultation. Demand a 2-year critical spare parts package (including seals, bearings, and filters) to be bundled with the initial purchase. Ensure the supplier provides on-site installation supervision and commissioning services, as improper setup is the leading cause of early-stage mechanical failure.
What should be considered regarding international trade policies and customs?
Check for anti-dumping duties or specific import tariffs on heavy machinery in your country. Ensure the supplier provides a Certificate of Origin to benefit from any applicable Free Trade Agreements (FTAs). Additionally, verify that the HS Code used for the turbine and its auxiliary parts is accurate to avoid customs delays or fines.





























