Annular blowout preventers
I have found results from2000+products and1000+suppliers aboutAnnular blowout preventers
Wellhead Annular Bop Hydraulic Cameron Bop Hydril Shaffer Blowout Preventer
Reliable Annular Blowout Preventer for Wellhead Safety Solutions
Oilfield Annular Bop Wellhead Pressure Control Blowout Preventer Equipment
Annular Bop API 16A Well Control Equipment Shaffer or Cameron Annular Bop/Blowout Preventer
API 6A RAM Annular Blowout Preventer (BOP) for High-Pressure Applications
Oilfield Annular Bop Wellhead Pressure Control Blowout Preventer
Good Quality High Pressure Annular Bop/Blowout Preventer Wp 5000psi~15000psi
API 16A 13 5/8" 5000 Psi for Annular Blowout Preventer
API 16A Annular Bop Spherical Rubber Seal Blowout Preventer for Wellhead
API OEM Bop Parts Blowout Preventer Spherical Sealing Element for Annular Bop Rubber Elements
API Cameron Annular Bop Fh 18 - 35 Shaffer Annular Blowout Preventer
Premium High-Performance Annular Blowout Preventer for Oil Drilling
Wholesale High Quality Annular Bop Blowout Preventer Oilfield Drilling Well Control Equipment
Annular Bop Blowout Preventer for Oilfield Drilling Well Control System Equipment
Durable Forged Steel Annular Blowout Preventer for High Pressure Wells with Reliable Sealing
Cost Effective Annular Blowout Preventer for Standard Operations with Easy Adaptation
Universal Annular Blowout Preventer for Various Pipe Sizes with Superior Seal Integrity
Fh48-35 Submersible Circular Annular Blowout Preventer, API 16A Standard, 35MPa 5000psi
Hydraulic Annular Bop (blowout preventer) for Oil Wellhead Control Equipment
API 16A Annular Bop Packing Element Rubber Packing Unit Blowout Preventer
Shaffer Carmeron Nov RS Shenkai Annular Bop Blowout Preventer Fz28-35
API 16A 9" Annular Bop Blowout Preventer for Wellhead Control
Fz28-21 U-Type Single RAM Double RAM Annular Bop Wellhead Blowout Preventer
Sourcing guidance for Annular Blowout Preventers
What are the critical technical specifications to consider when sourcing an Annular BOP?
Buyers must prioritize the Working Pressure (WP), typically ranging from 3,000 psi to 15,000 psi, and the Bore Size, which must match the wellhead configuration (e.g., 7-1/16", 11", 13-5/8", or 21-1/4"). Additionally, verify the packing element material (Nitrile, Neoprene, or Natural Rubber) based on the expected operating temperature and the presence of H2S (Hydrogen Sulfide) to ensure chemical compatibility and prevent premature failure.
Which international compliance standards are mandatory for Annular BOPs?
The gold standard for BOP manufacturing is API Specification 16A (Specification for Drill-through Equipment). Ensure the supplier holds a valid API 16A license and that each unit comes with a Certificate of Conformance (COC). For European projects, CE marking and PED (Pressure Equipment Directive) compliance may be required, while NACE MR0175 is essential for sour service environments to prevent sulfide stress cracking.
How does the design of the packing element affect long-term operational costs?
The packing element is the primary wear part. Sourcing units with high-fatigue life inserts can significantly reduce the Total Cost of Ownership (TCO). Look for 'spherical' or 'tapered' designs that allow for reclosure and stripping operations. Suppliers who provide genuine replacement kits and have passed PR2 (Performance Requirement level 2) testing offer better reliability, reducing expensive non-productive time (NPT) during drilling.
What quality validation steps should be requested before shipment?
Demand a comprehensive Data Acquisition Package (DAP) which includes Hydrostatic Pressure Tests (tested at 1.5x working pressure), Functional/Shell Tests, and Non-Destructive Examination (NDE) reports such as Magnetic Particle or Ultrasonic testing on critical welds and forged bodies. A drift test should also be performed to ensure the bore is clear and meets dimensional tolerances.
Cross-Border Procurement & Risk Management for Oilfield Equipment
How can I mitigate the risk of purchasing counterfeit or sub-standard API equipment?
Always verify the supplier's API credentials directly on the API Composite List website. For high-value assets like BOPs, it is highly recommended to hire a Third-Party Inspection (TPI) agency (such as SGS, BV, or DNV) to conduct an in-process factory audit and witness the final pressure tests before the balance payment is made.
What are the best practices for negotiating payment and lead times for heavy oilfield machinery?
Given the high manufacturing cost, a 30% deposit / 70% against LC (Letter of Credit) or T/T after TPI inspection is standard. Negotiate a liquidated damages clause for delivery delays, as BOP production can take 60 to 120 days. For urgent needs, check for 'stock units' on Made-in-China.com, but ensure they haven't exceeded their shelf-life for rubber components (usually 3-5 years).
What logistics precautions are necessary for shipping heavy pressure-control equipment?
Annular BOPs are extremely heavy and top-heavy. Ensure the supplier uses seaworthy steel-framed crates and applies anti-corrosion VCI (Volatile Corrosion Inhibitor) coatings to all machined surfaces and ring grooves. For international shipping, use FOB or CIF terms with specialized heavy-lift forwarders, and ensure the Packing List clearly identifies the HS Code (typically 8481.80) to avoid customs delays.
How do I ensure transaction security when dealing with overseas manufacturers?
Utilize secure sourcing channels like Made-in-China.com and prioritize Audited Suppliers. Use Escrow services or Trade Assurance where possible. Never transfer funds to private bank accounts; always ensure the beneficiary name matches the registered company name on the business license and API certificate.





























