500 ton truck crane
I have found results from40000+products and10000+suppliers about500 ton truck crane
2023 Year 8X4 Remoter Control Industry Reducer Motor Low Price Hook Lift Garbage Stc500 50 Ton Used SA Ny Mobile Crane Truck
Used 50 Ton Mobile Truck Crane Stc500 Excellent Condition & Competitive Price
50 Tons Stc500, 80 Tons Stc800, 100 Tons Stc1000 Truck Cranes Factory Price
Lifting Cranes Truck Zoomlion Large Crane Used 500 Ton All Terrain Mobile Crane
Used Mobile Crane Truck with Qy/Xct/Xca/Stc/Ztc 25/50/70/75/80/90/100/110/130/160/200/300/500-Ton
Used Sanyy Truck Mobile Crane Made in China Qy/Xct/Xca/Stc/Ztc 25/50/70/75/80/90/100/110/130/160/200/300/500-Ton
Top Brand 50 Ton Mobile Truck Crane Stc500 with High Performance Engine
50 Ton Truck Crane Trucks Mounted Tc500 Crawler Dump Truck Crane
50 Ton Used Truck Crane Low Working Time Used Sany Stc500 50tons Truck Crane in Stock for Sale
Zooomlion 500 Ton Truck Mounted Crane 2023 for Sale in Hunan, China
Used Sany 50 Ton Truck Crane Stc500 Straight Boom Crane, in Stock Construction Lifting Equipment
2022 Year 50-Ton Compact 4-Axle Chassis 5-Section Straight Boom Used Truck Crane Stc500
Second-Hand Snny Stc500 50 Tons Mobile Hydraulic Truck Crane
Used Sany Stc500 Hydraulic Truck Crane with 50-Ton Lifting Capacity Sany Stc500, Stc1000, Stc800 Used Truck Cranes for Sale
Hot Sale Original Factory New 500 Ton 160 Ton Xca500 All Terrain Truck Crane 500ton Rough Terrain Crane Cheap Price
Hot Selling 50 Ton Truck Crane Stc500 with Hydraulic Boom
XCMG Official Xca500 Used 2021 Year 500 Ton Mobile Truck Crane Used All Terrain Crane
Truck Crane 50 Ton High Quality Truck Mobile Crane Stc500 with Good Price with Max Height for Infrastructure Projects
Used SA-Ny Stc500 Mobile Crane Used 50 Ton Original Truck Crane
50 Ton Crane with Truck Sale in Saudi Abrabia Sany Stc500
Hot Model Stc500e Stc500 50 Ton Truck Crane
Hot Sale Used 50 Tons Mobile Crane Stc500 Telescopic Boom Truck Crane
Stc500 50 Ton Used Sany Crane Truck for Sale
Stc500 50-Ton Mobile Truck Crane Telescopic Boom for Infrastructure Projects
New Design 50 Ton Truck Mobile Crane Stc500 in West Asia
50 Ton Truck Crane Stc500 Brand New with Stable Working Performance
Sourcing guidance for 500 Ton Truck Crane
What are the key technical specifications to evaluate for a 500-ton truck crane?
When sourcing a heavy-lift crane, you must prioritize the Maximum Lifting Capacity (500t) and the Main Boom Length, which typically ranges from 80m to 100m. Ensure the crane features a high-strength U-shaped or oviform boom to minimize weight while maximizing structural rigidity. Additionally, verify the Engine Power (kW) and Torque to ensure the chassis can handle the gross vehicle weight during transit, and check for multi-axle steering systems (usually 7-9 axles) to guarantee maneuverability on construction sites.
Which safety and compliance standards are mandatory for international procurement?
For a 500-ton crane, compliance with ISO 9001 for manufacturing quality is a baseline. Depending on the destination, you must verify CE Marking for the European market, ANSI/ASME B30.5 for the United States, or GOST for Eurasian markets. It is critical to ensure the Load Moment Indicator (LMI) and Anti-Two Block systems are calibrated to international safety protocols to prevent structural failure or tipping during high-tonnage lifts.
How should a buyer assess the hydraulic and control systems of the crane?
Focus on the Hydraulic Pump and Valve brands; top-tier suppliers often integrate components from Rexroth or Kawasaki for precision. The control system should utilize CAN-bus technology for real-time diagnostics. Request information on the intelligent cooling system, which is vital for maintaining hydraulic pressure stability during prolonged heavy-lifting operations in extreme climates.
What are the typical usage scenarios for a crane of this capacity?
A 500-ton truck crane is primarily designed for large-scale infrastructure projects, such as bridge girder installation, wind turbine maintenance, and petrochemical plant assembly. Its mobility allows it to be deployed quickly across different sites compared to crawler cranes, making it ideal for urban construction where space for assembly is limited but high lifting capacity is required.
Cross-Border Procurement & Risk Management for Heavy Machinery
What are the primary risks when purchasing heavy machinery from overseas?
The most significant risks include Logistical Damage and Specification Mismatch. Due to the size of a 500-ton crane, it often requires disassembly for shipping. Ensure the contract includes a Pre-Shipment Inspection (PSI) by a third party like SGS or Intertek to verify that all components, including counterweights and jib extensions, are present and functional before the final payment is released.
How should shipping and delivery be handled for a 500-ton crane?
This equipment is typically shipped via RO-RO (Roll-on/Roll-off) or Breakbulk vessels. You must confirm the Incoterms; CIF (Cost, Insurance, and Freight) is common, but FOB (Free on Board) allows the buyer more control over the specialized heavy-lift carrier selection. Ensure the supplier provides a detailed Loading and Securing Plan to prevent shifting during maritime transit.
What strategies should be used for price negotiation and payment security?
Negotiate based on Total Cost of Ownership (TCO), including spare parts packages for the first 2,000 hours of operation. For payments, use a Letter of Credit (L/C) or Escrow services to ensure funds are only released upon the presentation of valid shipping documents and inspection certificates. On platforms like Made-in-China.com, look for Audited Suppliers to mitigate the risk of dealing with non-verified entities.
What after-sales support is necessary for such a complex machine?
A 500-ton crane requires on-site commissioning and operator training. Ensure the supplier commits to sending technical engineers to your location for the initial setup. The contract should specify a warranty period of at least 12 months or 2,000 working hours, and the supplier must guarantee the availability of critical spare parts in your region to minimize downtime.





























